Projects
Cranfield University
Feddon House Plant room
Refirbishment of plant room serving the Feddon accomodation at CRANFIELD

£60k
Ashe Construction
Cranfield Building 48 Heating upgrade
Instaflex GF and Uponor Ecoflex used on this new upgrade to the exisitng district mains

£70k
Chiltern District Council
Chiltern Crematorium
Installation of new chapel heating circuit and associated works

£100k
Open University
M Block pipework
Enabling works with BWIC

£100k
SDC
OU WILSON B
Refirbishment of heating system

£79K
AVDC
Chillers
new chillers and condenser for Gateway offices

£150k
Open University
Wilson B refirb
New radiator circuit and heat exchanger

£40k
HERTS COUNTY COUNCIL
Hemel Hempstead School
replacment of gas fired water heater and new gas solenoid valve

£12k
AVDC
New Boilers AVDC gateway
Replacement of boiler plant and controls with new system

£60K
Mouchel Oxford County Council
St Michaels CE School
Fit new radiator circuits.

£20k
Renault F1
CFD Building Mechanical
All mechanical work at the prestigious new CFD building Renault F1 Headquarters.

£300k
Open University
New Chiller and Pipework
New chiller pipework and associated mechanical works

£150k
Cranfield University
Steam Heating Hangar 85
Supply and fit 25 steam unit heaters complete with new steam and condense circuit.

£85K
Rexam Beverage Can Ltd
New Chemical Storage Tanks
Installation of new chemical coating storage tanks serving the main factory.

£150K
Open University
Perry Block Enabling Works (milton Keynes)
Installation of a new LTHW plant room & associated pipework.

£110K
Rutherford Laboratories
Cooling Towers (Didcot)
the upgrade of the local existing 8" steel cooling services to the laboratories.

£20K
M.F Toefield & Son
Bearbrook Lower School (Aylesbury)
Installation of mechanical & public health Services For new classrooms & IT suites.

£20K
Bedfordshire County Council
Vernon Place Offices (Dunstable)
Plant Room Refurbishment. The installation of new boilers, cold water booster set & associated pipework.

£70K
Cranfield University
Feddon House (Bedford)
The installation of new mechanical & domestic services throughout Feddon House student accomadation block. This was undertaken in Yorkshire Pressfit fittings.

£50K


 

WELCOME   ABOUT   SERVICES   PROJECTS   GALLERY   TESTIMONIALS   NEWS   DOWNLOADS   CONTACT   USEFUL TABLES  

Client Project Details Value