Cranfield University |
Feddon House Plant room |
Refirbishment of plant room serving the Feddon accomodation at CRANFIELD
|
£60k |
Ashe Construction |
Cranfield Building 48 Heating upgrade |
Instaflex GF and Uponor Ecoflex used on this new upgrade to the exisitng district mains
|
£70k |
Chiltern District Council |
Chiltern Crematorium |
Installation of new chapel heating circuit and associated works
|
£100k |
Open University |
M Block pipework |
Enabling works with BWIC
|
£100k |
SDC |
OU WILSON B |
Refirbishment of heating system
|
£79K |
AVDC |
Chillers |
new chillers and condenser for Gateway offices
|
£150k |
Open University |
Wilson B refirb |
New radiator circuit and heat exchanger
|
£40k |
HERTS COUNTY COUNCIL |
Hemel Hempstead School |
replacment of gas fired water heater and new gas solenoid valve
|
£12k |
AVDC |
New Boilers AVDC gateway |
Replacement of boiler plant and controls with new system
|
£60K |
Mouchel Oxford County Council |
St Michaels CE School |
Fit new radiator circuits.
|
£20k |
Renault F1 |
CFD Building Mechanical |
All mechanical work at the prestigious new CFD building Renault F1 Headquarters.
|
£300k |
Open University |
New Chiller and Pipework |
New chiller pipework and associated mechanical works
|
£150k |
Cranfield University |
Steam Heating Hangar 85 |
Supply and fit 25 steam unit heaters complete with new steam and condense circuit.
|
£85K |
Rexam Beverage Can Ltd |
New Chemical Storage Tanks |
Installation of new chemical coating storage tanks serving the main factory.
|
£150K |
Open University |
Perry Block Enabling Works (milton Keynes) |
Installation of a new LTHW plant room & associated pipework.
|
£110K |
Rutherford Laboratories |
Cooling Towers (Didcot) |
the upgrade of the local existing 8" steel cooling services to the laboratories.
|
£20K |
M.F Toefield & Son |
Bearbrook Lower School (Aylesbury) |
Installation of mechanical & public health Services For new classrooms & IT suites.
|
£20K |
Bedfordshire County Council |
Vernon Place Offices (Dunstable) |
Plant Room Refurbishment. The installation of new boilers, cold water booster set & associated pipework.
|
£70K |
Cranfield University |
Feddon House (Bedford) |
The installation of new mechanical & domestic services throughout Feddon House student accomadation block. This was undertaken in Yorkshire Pressfit fittings.
|
£50K |
| Client | Project | Details | Value |